Installation In 65510 Hünstetten :
Under the most difficult conditions, our system of 21.5 kwp was installed in Janur 2023. Klarsolar clarified all arising problems promptly and conclusively. The work was made incredibly difficult by the weather conditions, but still completed on time by the use of many forces. This also applies to the necessary subsequent improvements. For this again many thanks at this point !
The planning of the plant was based on all our wishes and needs, taking into account the economic efficiency, and then implemented. From emergency power to inverter and wallbox. Some language difficulties could be mastered by the use of the Google translator during the construction.
Show original
Translation