The offer package, including the smart meter, is a well-rounded service.
The planning was competent with finding the installation location for the inverter battery and cable routing.
However, the drone flight did not provide any measurement data from the roof, although there were nice pictures of the house and property, so there were problems with the roof planning.
Thanks to the good cooperation with Mr. Rogozin, the roof planning could be corrected.
The installation of the system from module assembly, electrical integration and commissioning was completed in a very short time frame (approx. 14 days) with good scheduling agreements.
The tradesmen carrying out the work were friendly and did a good job.
The invoice does not list detailed prices for the individual items. This gives the impression of paying too much.
Show original
Translation