The company Kaiser has provided me with the initial installation of a log central heating system with an HDG Euro50 boiler in a 150 year old farmhouse.
This was a very extensive project with a separate boiler room in the outbuilding.
Components were:
Boiler room with log boiler, 4000l buffer tank and extensive, highly efficient mixer assemblies from Baunach Rendemix.
Domestic hot water installation in the house incl. new piping from the water meter.
The connection of 17 radiators.
Of course, special solutions are required for the first installation in such a building.
These were professionally developed and implemented by Mr. Kaiser and his outstanding team.
I am not a simple customer. I have very high quality standards and sometimes unconventional wishes. --> These were also implemented more than satisfactorily.
During the project, the so-called "Kaiser standard" was defined.
--> Think first, then work. Everything is meticulously aligned and measured until everything fits exactly. Clean work is done; even on freshly painted walls the guys install a complete domestic water distribution WITHOUT traces. Consideration is given to historic building components. It is implemented EXACTLY as I want it.
If something is unclear, the boiler manufacturer, mixer manufacturer or the chimney builder is called at the same moment.
His team was continuously working on my construction site for about 6 weeks. The interaction was always friendly and respectful and everyone had the goal in mind.
I can recommend Mr. Kaiser without reservation, he can be proud of his company and his employees.
Show original
Translation