Scheduling was completely adhered to ! (Renovation of the chimney, dismantling of the old oil heating, the domestic hot water tank, as well as disposal of the oil tanks and the still existing heating oil. Bringing in and installation Pellet Condens, separate buffer storage with fresh water module, 2 heating circuit pump modules and Flexilo fabric tank with vacuum suction system).
Commissioning and trial operation on 5 day !!!
Simple -- Very good !!!
Show original
Translation