As part of the regular inspection of the fire protection system in our company, I, as the technician responsible for the building, worked with CNS to repair the emergency lighting.
According to the inspection report, the deficiencies included the lack of documentation regarding the installation locations of the lamps, the assigned connection type and illumination intensity.
The CNS team needed 4 working days to rectify the defects and install some new luminaires for a 400 m² store.
Many thanks for the friendly and speedy cooperation, despite the long journey. This power performance saved us a lot of trouble with the authorities!